MODEL OF LATERITE NICKEL DEPOSITS BASED ON LGSO AND HGSO VALUES PT MITRA KARYA AGUNG LESTARI
DOI:
https://doi.org/10.23960/jge.v10i1.305Keywords:
HGSO, IDW, LGSO, Nickel Laterite, PT MKALAbstract
References
Anas, A. V., Amalia, R., Qaidahiyani, N. F., Djamaluddin, & Herin, S. R. D. (2020). Sensitivity Analysis of Net Present Value Due to Optimal Pit Limit in PT Ceria Nugraha Indotama, Kolaka Regency, Southeast Sulawesi Province. IOP Conf. Ser.: Mater. Sci. Eng. 875 012050
Akbari, A. D., Osanlou, M., & Shirazi, M. A. (2008). Determination of Ultimate Pit Limits in Open Mines Using a Real Option Approach. International Journal of Engineering Science. 19. 23-38.
Annels, A, E. (2012). Mineral Deposit Evaluation: A Practical Approach. Springer Science & Business Media.
Bargawa, W. S. (2018). Perencanaan Tambang. Yogyakarta: Kequ Book.
Butt, C. R. M., & Cluzel, D. (2013). Nickel Laterite Ore Deposits: Weathered Serpentinites. Elements, 9(2), 123-128.
Cardu, M., Ciccu, R., Lovera, E., & Michelottl, E. (2006). Mine Planning and Equipment Selection. The Fifth International Symposium on Mine Planning and Equipment Selection, pp. 1234-1239, Torino.
Dalvi, A. D., Bacon, W. G. & Osborne, R. C. (2004). The Past and The Future of Nickel Laterites. PDAC 200 International Convention, Trade Show & Investors Exchange (pp. 1-27). The Prospectors and Developers Association of Canada Toronto.
Guntara, N., Hartono, H., & Helmi, H. (2021). Pemodelan Sebaran Endapan Nikel Laterit Pada Daerah X Kabupaten Morowali Utara Provinsi Sulawesi Tengah. GEODA, Vol. 02, No. 02, September 2021, pp. 73-86.
Rahmi, F. & Yulhendra, D. (2019). Optimalisasi Pit Limit Penambangan Mineral Nikel Laterit PT. ANTAM Tbk. Unit Bisnis Penambangan Nikel Di Site Pomalaa Sulawesi Tenggara Di Front X. Jurnal Bina Tambang, Vol 4., No. 3
Ramadhan, M. S., Ilyas, A., Nur, I., & Widodo, S, (2022). Perbandingan Antara Metode Poligon, Inverse Distance Weighting, Dan Ordinary Kriging Pada Estimasi Sumberdaya Timah Aluvial, Dan Analisis Sebaran Endapannya. Jurnal Geomine, 9(3), 254-266.
Hardiyanto., Widodo, S., & Nurwaskito, A. (2015). Pemodelan Endapan Nikel Laterit Kabupaten Morowali, Provinsi Sulawesi Tengah. Jurnal Geomine, Vol 02, Agustus 2015.
Liu, D., Li, G., Hu, N., Xiu, G., & Ma, Z. (2019). Optimization of The Cut-Off Grade for Underground Polymetallic Mines. Gospodarka Surowcami Mineralnymi, Mineral Resources Management 35 (1): 25-42.
Marsh, E., Anderson, E., and Gray, F. (2010). Ni-Co Laterites – A deposit model. Chapter H of Mineral Deposit Models for Resource Assessment. UGSG Investigations Report 2010-5070-H.
Rifandy, A., & Sutan, S. (2007). Optimasi Pit Tambang Terbuka Batubara dengan Pendekatan Incremental Pit Expansion, BESR dan Profit margin. JGP (Jurnal Geologi Pertambangan), Vol. 2 No. 24.
Thamsi, A., Ainunnur, I., Anwar, H., Aswadi, M. (2023). Estimasi Sumberdaya Nikel Menggunakan Metode Inverse Distance Weigth PT Ang and Fang Brothers. JGE (Jurnal Geofisika Eksplorasi), 9(1), 5-17. doi: https://doi.org/10.23960/jge.v9i2.235.
Downloads
Additional Files
Published
How to Cite
Issue
Section
Citation Check
License
Authors/Readers/Third Parties can read, print and download, redistribute or republish the article (e.g. display in a repository), translate the article, download for text and data mining purposes, reuse portions or extracts from the article in other works, sell or re-use for commercial purposes, remix, transform, or build upon the material, they must distribute their contributions under the same license as the original Creative Commons Attribution-NonComercial (CC BY-NC).